Wings (pg4)

 

 

RV6A Home
Up
Flight Adventures!
Flight Testing
First Flight!
WA to CA move
Finishing Stages
Firewall Forward
Panel & Electrical
Fuselage
Empennage
RV-6A Paint Job
2013 Pictures

 

 

 

 

 

Aviation Links:

Van's Aircraft

Van'sAirforce.net

AirNav.com

AeroSportPower

Dynon Avionics

AeroElectric

Connection

Stark Avionics

 

 

RV-6A Home Finishing Stages Firewall Forward Fuselage Panel & Electrical Wings Empennage
 
Back Next

Wings:   pg 1   |  pg 2  |  pg 3  |  pg 4  |  pg 5  |  pg 6   

 

Here are a couple shots of the left aileron spar while drilling lightening holes when I was building the aileron skeletons:

 

Here the aileron skeleton is cleco'd together, almost ready for priming and riveting:

 

 

And here's me and Rachel with the aileron skeleton, ready for priming and riveting.  The lead pipe at the leading edge is the built-in counterbalance:

 

Aileron skeleton prior to skinning:

 

Aileron skin with stiffners drilled and cleco'd:

 

Wings:   pg 1   |  pg 2  |  pg 3  |  pg 4  |  pg 5  |  pg 6   

Back Next
 
 

  This page was last updated on 12/18/11.

 

Click here for questions or feedback. 

Copyright © 2007.  All rights reserved.  Chris Hand, chris@ckhand.com