|
Aviation Links:
|
Wings: pg 1 | pg 2 | pg 3 | pg 4 | pg 5 | pg 6
Here are a couple shots of the left aileron spar while drilling lightening holes when I was building the aileron skeletons:
Here the aileron skeleton is cleco'd together, almost ready for priming and riveting:
And here's me and Rachel with the aileron skeleton, ready for priming and riveting. The lead pipe at the leading edge is the built-in counterbalance:
Aileron skeleton prior to skinning:
Aileron skin with stiffners drilled and cleco'd:
Wings: pg 1 | pg 2 | pg 3 | pg 4 | pg 5 | pg 6
|
This page was last updated on 12/18/11.
Click here for questions or feedback. Copyright © 2007. All rights reserved. Chris Hand, chris@ckhand.com
|