Electrical (pg 6)

 

 

RV6A Home
Up
Flight Adventures!
Flight Testing
First Flight!
WA to CA move
Finishing Stages
Firewall Forward
Fuselage
Wings
Empennage
RV-6A Paint Job
2013 Pictures

 

 

 

 

 

Aviation Links:

Van's Aircraft

Van'sAirforce.net

AirNav.com

AeroSportPower

Dynon Avionics

AeroElectric

Connection

Stark Avionics

 

 

RV-6A Home Finishing Stages Firewall Forward Fuselage Panel & Electrical Wings Empennage

 

Back Next

Panel:  pg 1 | pg 2 | pg 3 | pg 4 | pg 5 | pg 6

Electrical:  pg 1 | pg 2 | pg 3 | pg 4 | pg 5 | pg 6 | pg 7 | pg 8

 

I ran the strobe light power supply power/ground wires and the Trio EZ-1 altitude hold shielded cable along the right side rail to the area behind the baggage compartment bulkhead.  This next photo shows how I passed the wiring run through the rear spar bulkhead/cabin frame area:

 

Here are the same wires shown above as they pass through the baggage compartment:

 

And here's those same wires passing through the baggage compartment bulkhead to where the power supply and servo are mounted:

 

 

Panel:  pg 1 | pg 2 | pg 3 | pg 4 | pg 5 | pg 6

Electrical:  pg 1 | pg 2 | pg 3 | pg 4 | pg 5 | pg 6 | pg 7 | pg 8

Back Next
 
 

  This page was last updated on 12/18/11.

 

Click here for questions or feedback. 

Copyright © 2007.  All rights reserved.  Chris Hand, chris@ckhand.com