Panel (pg 2)

 

 

RV6A Home
Up
Flight Adventures!
Flight Testing
First Flight!
WA to CA move
Finishing Stages
Firewall Forward
Fuselage
Wings
Empennage
RV-6A Paint Job
2013 Pictures

 

 

 

 

 

Aviation Links:

Van's Aircraft

Van'sAirforce.net

AirNav.com

AeroSportPower

Dynon Avionics

AeroElectric

Connection

Stark Avionics

 

 

RV-6A Home Finishing Stages Firewall Forward Fuselage Panel & Electrical Wings Empennage

 

Back Next

Panel:  pg 1 | pg 2 | pg 3 | pg 4 | pg 5 | pg 6| pg 7

Electrical:  pg 1 | pg 2 | pg 3 | pg 4 | pg 5 | pg 6 | pg 7 | pg 8

 

View from right side during panel construction, partially wired with some instruments fit and installed but no radio stack yet:

 

Close up of right side of panel before fitting radio stack:

 

Left side of panel is shown here during construction.  The Lowrance 200C GPS has been fit and the mount I made is visible in the cutout next to the Dynon EFIS:

 

Left side view of partially constructed RV-6A panel temporarily installed;

 

Side view of panel showing some of the instruments and avionics installed:

 

Once I thought it was done (of course small changes and touch up ended up being necessary), I removed everything to clean, prime, and paint the panel in the same flat grey enamel (rattle can) that I used on the rest of the cockpit area:

 

 

Panel:  pg 1 | pg 2 | pg 3 | pg 4 | pg 5 | pg 6| pg 7

Electrical:  pg 1 | pg 2 | pg 3 | pg 4 | pg 5 | pg 6 | pg 7 | pg 8

Back Next
 
 

  This page was last updated on 12/18/11.

 

Click here for questions or feedback. 

Copyright © 2007.  All rights reserved.  Chris Hand, chris@ckhand.com